Troll West Electrification Topside modification

Summary

Short description

The overall goal for the Troll West Electrification project (TWEL) is to significantly reduce the CO2 emissions from Troll B (TRB)and Troll C (TRC) by using electrical power from shore (Kollsnes) to replace power from the existing gas turbines at the platforms. The processing systems and other energy-intensive systems on both platforms will now be driven by electricity, except for the large export compressors

One of the main challenges was to meet a tight delivery schedule due to the limited heavy lift campaigns Offshore. Teknotherm were responsible for the design and delivery of the necessary HVAC equipment for the new modules on Troll B and Troll C.

More information

Contact Teknotherms Offshore office in Oslo, Norway.

Our scope included

  • Supply/Extract AHU’s
  • Duct Heaters
  • Electric Panel Heaters
  • Fans
  • Sound attenuators
  • Cooling coils
  • Fire and Shut off dampers
  • Black start panel and filter regulators
  • Intake louvres and filters
  • Filters
  • Jet hoods
  • Intake Louvre Hoods
  • Vibration monitoring
  • PDI Recovery coil
  • VSD’s in cabinets
  • Engineering, detailed design, documentation, and project management